TPS62743EVM-689: 1.2 ~ 3.3V @ 300mA, 2 ~ 5.5V in

Summary

This user’s guide describes the characteristics, operation, and use of the Texas Instruments TPS62743 evaluation module (EVM). This EVM is designed to help the user easily evaluate and test the operation and functionality of the TPS62743. The EVM converts a 2.0-V to 5.5-V input voltage to a regulated output voltage that is set between 1.2 V and 3.3 V at up to 300 mA. The TPS62743 has an ultra-low quiescent current of 360 nA. This user’s guide includes setup instructions for the hardware, a printed-circuit board layout for the EVM, a schematic diagram, a bill of materials, and test results for the EVM.

The TPS62743 is a 300-mA, synchronous, step-down converter in a tiny 1.6 x 0.9-mm, 8-ball DSBGA package. The output voltage is fixed inside the device by the connection of the three VSELx pins.

The TPS62743EVM-689 uses the TPS62743 device. The EVM operates with full-rated performance with an input voltage between 2.0 V and 5.5 V.

Specifications

Manufacturer Texas Instruments
Category AC/DC and DC/DC Conversion
Sub-Category DC/DC SMPS - Single Output
Eval Board Part Number 296-42606-ND
Eval Board Supplier Texas Instruments
Eval Board Normally In Stock
Topology Step Down
Outputs and Type 1 Non-Isolated
Voltage Out: Factory Set 1.2 ~ 3.3 V
Current Out 300 mA
Voltage In 2 ~ 5.5 V
Efficiency @ Conditions >95%, 3.6V in, 3.3V @ 0.1 ~ 190 mA
>93%, 4.2V in, 3.3V @ 0.04 ~ 300 mA
>92%, 5V in, 3.3V @ 0.04 ~ 300 mA
Voltage Out Range 1.2 ~ 3.3 V
Features Current Limit (Adj. or Fixed)
Power Save Mode
Shutdown, Enable, Standby
Switching Frequency 1.2 MHz
Standby Current [Typical] 700 nA
Quiescent Current [Typical] 360 nA
Component Count + Extras 7 + 0
Internal Switch Yes
Design Author Texas Instruments
Application / Target Market Energy Harvesting
Medical
RF: BlueTooth
Standby Current [Maximum] 1 µA
Quiescent Current [Maximum] 1.8 µA
Main I.C. Base Part TPS62743
Date Created By Author 2015-06
Date Added To Library 2016-02

Eval Board

Order a fully assembled board:

Quantity Available: 0

Quantity:

Media